0.002 m/s. Invisible to marine life.
A gravity-driven, six-vein omnidirectional seawater head in Super Duplex stainless steel. Engineered for Red Sea and Arabian Gulf power service, and benchmarked against the strictest intake standard in force: US EPA Clean Water Act §316(b).
Engineering
Four design decisions that set InvisiHead apart in Gulf and Red Sea power service.
Velocity below the threshold of biology
EPA set its 0.15 m/s impingement limit from the swimming performance of juvenile fish. InvisiHead’s approach field runs at 0.002 m/s, nearly two orders of magnitude slower. Organisms near the head are not pinned and not stressed. Impingement is removed at the source, by velocity rather than by screens.
Six veins. No dominant direction.
Flow divides equally across six radial veins and draws uniformly through 360°. No local velocity peak, and no sensitivity to tidal reversal or cross-current heading. The approach field holds its uniformity as Gulf and Red Sea currents shift.
Gravity-flush into NatSep and NatDiff basins
InvisiHead runs on hydrostatic head alone and ties directly into AES NatSep and NatDiff basins. A gravity-flush cycle maintains vein open area without dedicated backwash pumping, and there is no powered equipment on the seabed.
Super Duplex for 40+ ppt, 30 °C+ service
Super Duplex stainless steel (UNS S32750 / S32760 class, PREN ≥ 40) resists pitting and crevice corrosion in warm, high-chloride water where Gulf salinity routinely exceeds 40 ppt. Roughly three times the yield strength of 316L allows lighter sections at equal load.
Specifications & compliance
Core engineering data and the regulatory benchmark.
| Approach velocity | 0.002 m/s |
| Draw pattern | 6-vein omnidirectional, 360° |
| Head diameter | 0.5 – 3.5 m |
| Drive | Hydrostatic head |
| Cleaning | Gravity flush |
| Basin integration | NatSep · NatDiff |
| Material | Super Duplex SS, PREN ≥ 40 |
| Benchmark | US EPA CWA §316(b) |
Full §316(b) compliance, with a 76× margin
40 CFR 125.94(c) caps through-screen design velocity at 0.5 ft/s (0.15 m/s) for impingement BTA. InvisiHead operates at 0.002 m/s. That is the performance basis for its zero-marine-harm design.
Applied as the international benchmark; project permitting follows applicable KSA environmental requirements.
Commission site-specific engineering
Start the engineering phase of your FEED package with an AES consultation and preliminary design.
Credited in full toward your InvisiHead equipment order when a PO follows within 12 months.
Book your consultation · $1,200 →Opens our secure payment page in a new tab. Non-refundable if no PO is issued within 12 months.
The $1,200 Consultation & Preliminary Design Fee serves as a mutual commitment to the site-specific engineering phase of your FEED package. American Eco Systems, LLC (AES) will credit 100% of this fee toward the final purchase price of the InvisiHead equipment units. This credit applies to any Purchase Order issued within twelve (12) months of the initial consultation payment, ensuring these preliminary design services are ultimately cost-neutral to your firm upon project execution. If no Purchase Order is issued within twelve (12) months of the initial consultation payment, the credit expires automatically and the fee becomes non-refundable.
See the plume before you pour the concrete.
View InvisiHead in our 3D submerged outfall simulators, built for process engineers sizing intake and outfall systems.
Info@amecosys.com · +1 (862) 445-0016 · www.amecosys.com Track record: AES Project References 2026
Specifications subject to project engineering.