Future-Proof Your SWRO Infrastructure: The Elmosa InvisiHead™ Seawater Intake System

The Engineering Advantage Designed for the extreme demands of Middle Eastern SWRO desalination and global industrial power, the Elmosa InvisiHead (IH) replaces outdated, high-maintenance onshore traveling band screens with a passive, offshore filtration powerhouse. By integrating the offshore IH diffuser with an onshore NatSep sedimentation basin via a gravity-flush system, engineers can drastically reduce the plant’s onshore footprint while ensuring 100% uninterrupted flow.

Core System Benefits:

  • Zero Marine Impingement (Regulatory Dominance): Engineered with a revolutionary 0.002 m/s approach velocity and a specialized 6-vein omnidirectional flow design. Marine life, including local fish populations, swim safely around the head without being drawn in, instantly exceeding strict US EPA 316(b) Rule and EU BAT environmental compliance standards.
  • Extreme Hydrodynamic Resilience: Forged from 2507 Super Duplex Stainless Steel, the system operates completely submerged and is immune to surface turbulence. Documented field operations prove the InvisiHead withstands Category 5 hurricanes and extreme hydrodynamic scour without structural degradation.
  • Passive Biofouling & Debris Management: The ultra-low intake velocity prevents the suction of suspended solids, seaweed, and debris. The system acts as a natural separator at the source, ensuring only clean water enters the intake pipeline, drastically extending the lifespan of reverse osmosis membranes.
  • CAPEX & OPEX Eradication: Moving the primary screening process offshore eliminates the need for expensive, mechanical onshore filtration infrastructure. The gravity-driven flow requires zero active moving parts at the intake site, dropping maintenance costs and mechanical failures to near zero.

See the Engineering in Action Interact with our 3D submerged hydrodynamic models. See exactly how the 6-vein InvisiHead manages gravity-currents, protects marine ecosystems, and integrates with 1.8m HDPE pipelines for heavy Gulf conditions.

Engineering Fee Reimbursement Policy The $1,200 Consultation & Preliminary Design Fee serves as a mutual commitment to the site-specific engineering phase of your FEED package. American Eco Systems, LLC (AES) will credit 100% of this fee toward the final purchase price of the InvisiHead equipment units. This credit applies to any Purchase Order issued within twelve (12) months of the initial consultation payment, ensuring these preliminary design services are ultimately cost-neutral to your firm upon project execution.